Archer Flooring Ltd

NOTTINGHAM'S FLOORING SPECIALIST

Call our Office on 0115 9390890

Blog Entries Tagged as “Contract”  

  • Apr 16

    Accent Offices

    Accent Offices - Ashby - Leicester

    Below is Accent Offices that we sub contracted to Sean Bestwick Flooring. More Pictures to follow but here is what we have currently. The Customer supplied their own carpet tiles and also the funky LVT flooring that you will see in the kitchen.

    To be Continued ....

    Archer Flooring

    Posted By Archer Flooring on Apr 16, 2014 at 2:02 PM

    Categories: Contract
  • Apr 15

    Lynncroft Primary School

    Here is Recent Refit of Lynncroft primary School in Eastwood Nottingham

    http://www.lynncroft.ik.org/home.ikml

    Archer Flooring

    Posted By Archer Flooring on Apr 15, 2014 at 3:22 PM

    Categories: Contract
  • Mar 6

    Fairfield Primary School

    Fairfield Primary School

    Toton Lane
    Stapleford
    Nottingham
    NG9 7HB

    Click here to visit Fairfields Website.

    The old Computor room shortly after arrival on site

    The old stuck down carpet is removed in 300mm strips

    Removal of old stuck down carpet, Subfloor ready for screeding  before fitting the new carpet

    One more section to fit

    Competed carpet, Site cleaned and read for the children to resume their studies

    Archer Flooring

    Posted By Archer Flooring on Mar 6, 2014 at 10:26 AM

    Categories: Contract
  • Mar 3

    Rushcliffe Veterinary Surgery

    Bill Bowler Veterinary Surgery
    Rushcliffe Veterinary Centre
    Collington Way
    West Bridgford
    Nottingham
    Nottinghamshire, NG2 7LR

    Click here to visit Rushcliffe Vets Website

    Below is the re-fit of Rushcliffe Veterinary Surgery.

    Firstly the skirting has to be fitted.

    Thats one room done! Now Dean just needs to tidy up!.

    Thats better! Nice and clean ready for the flooring to be laid down.

    The finished result for the first room!.

    Now onto the second room!.

    A quick tidy up! and now its also ready for the flooring to go down.

    Below you can see that the floor has been fitted and dean is cold welding the floor, this creates a completely sealed floor.

    The finished result!.

    The following room had to be fully prepped, which means it had to have a screed to level out the floor so the flooring lays on a completely flat surface. Then Dean Had to fit the skirtings like in the previous rooms.

    And here we are the floor has been screeded, the skirtings have been fitted, and now the floor has been laid out ready to fit.

    The final Result, the floor has been fitted and Dean has cold welded the skirting to the floor.

    Archer Flooring

    Posted By Archer Flooring on Mar 3, 2014 at 4:31 PM

    Categories: Contract
  • Feb 25

    Cafe Zing

    Click here to visit Cafe Zing

    Look for the Pictures soon to come of the refit of

    Cafe Zing 20 High Street Long Eaton Nottingham NG10 1LL

    Arrival on site


    Existing floor , this is only the top layer

    Top vinyl during uplift and removal off site

    Sheet vinyl removed to expose two more layers of vinyl tiles ! Great !!!

    Old tiles NOT wanting to leve the building

    Stripping machine in action, 3/4 of a ton of tiles and vinyl where removed off the floor.

    Final few tiles being removed by machine 4hrs after arrival, and the job begins to look clean.

    Epoxy damp proof membrane being applied (black)

    Archer Flooring

    Posted By Archer Flooring on Feb 25, 2014 at 12:30 PM

    Categories: Contract